Home
Product
Contact
About
FAQ
Blog
More
We offer three ADU sizes to fit your needs:
Model M – 300 sq. ft.
Model S – 450 sq. ft.
Model K – 600 sq. ft.
The entire process, from permit application to receiving the certificate of occupancy, takes approximately 3-4 months.
The price includes a fully built ADU with appliances and cabinets. However, it does not cover land, site preparation, utility hookups, or foundation.
Our team will apply for the required permits. Permit costs are included in the listed price but may vary by city.
With the CFS technology, we are able to manufacture the frame offsite and ship it in panels to the site.